Supporting Maintenance Work at a Space Constraint Site

Mount Cameron Road, Hong Kong

Location

Contractor

Project Type

Location

Mount Cameron Road, Hong Kong

Project Type

Slope Maintenance Work

Main Contractor

China Geo-Engineering Corporation

Background

Introduction & Project Information

  • Developer: Civil Engineering and Development Department (CEDD)
  • Delivery date: 29 August 2023
  • Loads: Mixer, blowers, LEDs, security booth
  • Model: Silo
  • Input current to the Silo: ~ 30-40 amps
  • 83.30%

    less exposure to diesel and noise pollution

    32 times

    quieter than diesel genrator

    51%

    CO2 reduction (by reducing the operation time of 75 kVA generator)

    Zero

    on-site air pollutant, improve workers’ and nearby residents’ health

    The Solution

    Results

    "In the past, we constantly received complaints from the neighborhood regarding the disruptive noise and unpleasant smell produced by the 75 kVA diesel generator on site. Ampd, as a BESS expert, came to study the condition of our site and recommended their new product, the Silo, as the solution. Since transitioning to the Silo, we have noticed a significant reduction in both noise and carbon emissions. This not only effectively addressed the concerns raised by the residents but also enhanced the accessibility of our model to remote and hilly areas, thanks to its lightweight and slim design. We genuinely appreciate the positive impacts that Silo has brought."

    Mr. German Leung
    General Manager (Foundations Department), China Geo-Engineering Corporation

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.