Supporting Maintenance Work at a Space Constraint Site
Mount Cameron Road, Hong Kong
Background
Introduction & Project Information
83.30%
less exposure to diesel and noise pollution
32 times
quieter than diesel genrator
51%
CO2 reduction (by reducing the operation time of 75 kVA generator)
Zero
on-site air pollutant, improve workers’ and nearby residents’ health
The Challenge
The Solution
Results
"In the past, we constantly received complaints from the neighborhood regarding the disruptive noise and unpleasant smell produced by the 75 kVA diesel generator on site. Ampd, as a BESS expert, came to study the condition of our site and recommended their new product, the Silo, as the solution. Since transitioning to the Silo, we have noticed a significant reduction in both noise and carbon emissions. This not only effectively addressed the concerns raised by the residents but also enhanced the accessibility of our model to remote and hilly areas, thanks to its lightweight and slim design. We genuinely appreciate the positive impacts that Silo has brought."
Mr. German Leung
General Manager (Foundations Department), China Geo-Engineering Corporation
Download Case Study
Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.
Download Case Study
Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.