Background
Introduction & Project Information
99.99%
uptime throughout the project period
85%
CO2 reduction (vs. 350 kVA generators)2
190 amps
highest current measured
Zero
air quality pollutants leading to a better working environment
1Assuming a CO2 emission intensity of 0.39 kg per kWh (Source: CLP Sustainability Report 2021)
The Challenge
The Solution
Results
"We are very excited to see an 85% reduction in carbon emissions and zero downtime during our project. Since the project is so close to residential areas, the Enertainer was integral to keeping air and noise pollution to a minimum. We were also impressed by Ampd’s support in developing an accessory that helped us install the unit in a tight area. We will be deploying more Enertainers at our sites and are looking forward to seeing what Ampd comes up with next."
China Overseas Building Construction Ltd.
Download Case Study
Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.
Download Case Study
Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.