Background

Introduction & Project Information

  • Installation date: Dec 2022
  • Loads: 2 Tower cranes, 2 Concrete booms
  • Enertainer Model: Enertainer L x1
  • Input current to the Enertainer: 20 to 55 amps
91%

CO2 reduction (vs. 2 X 350 kVA generators)*

~Zero

noise and air pollution with hydrogen

Internet connected continuous monitoring

Stable and reliable supply of energy

*Assuming a hydrogen generator CO2 emission intensity of 0.1875 kg per kWh and diesel emission intensity of 2.64 kg per litre

The Solution

Results

“Successfully recharging the Enertainer using a blue hydrogen-powered generator was a significant step forward in establishing a cleaner and more pleasant construction site. The Enertainer has replaced four diesel generators, resulting in the saving of 72 tons of CO<sub>2</sub> emissions, 40,000 litres of diesel, and AUD$48,000 per month. The Enertainer emerges as a game-changer, better for the environment, greener and safer. We can’t wait to see it being implemented on our other projects, further reducing A W Edwards carbon footprint, and committing to achieving net zero carbon emissions in 2050.”

Mr. Raymond Hudd
Project Manager, A W Edwards

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.