A Fully Electrified Construction Site with Zero Diesel Gensets
Lee Kung street, Hung Hom
Background
Introduction & Project Information
71%
operating cost (1 x Enertainer L replacing 1 x 350 kVA Diesel Generator)
72%
CO2 reduction 1 (1 x Enertainer L replacing 1 x 350 kVA Diesel Generator)
235 amps
highest current measured
Zero
on-site air pollution, better for workers’ health
1Average carbon intensity of electricity is 0.37 kgCO2 per kWh (Source: CLP Sustainability Report 2020)
The Challenge
The Solution
Results
"As Hong Kong aims to reach carbon neutrality by 2050, Paul Y strives to lead Hong Kong in achieving this ambitious goal. Ampd Energy’s Enertainer perfectly aligns with this value and helps us reach the zero-carbon goal by drastically reducing our carbon footprint and at the same time reducing our long-term operational costs. The Enertainer allowed this site on Lee Kung Street to be fully electrified, eliminating the need for diesel gensets. We were impressed with the performance of the Enertainer, and have purchased and deployed multiple units on other sites. We are also very proud that Ampd Energy is a local Hong Kong company that is actively building a sustainable future for the construction industry."
Mr. Kenny W.L. Li
Director & General Manager, Paul Y Engineering Group
Download Case Study
Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.
Download Case Study
Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.