A Fully Electrified Construction Site with Zero Diesel Gensets

Project details

Location

Lee Kung Street, Hung Hom

Main Contractor

Paul Y. Engineering Group

Project Type

Residential Development

Country

HK

71%

operating cost (1 x Enertainer L replacing 1 x 350 kVA Diesel Generator)

72%

CO2 reduction 1 (1 x Enertainer L replacing 1 x 350 kVA Diesel Generator)

235 amps

highest current measured

Zero

on-site air pollution, better for workers’ health

1Average carbon intensity of electricity is 0.37 kgCO2 per kWh (Source: CLP Sustainability Report 2020)

Background

Further information about this project will be available soon. Please check back for updates.

learn more

Challenge

Further information about this project will be available soon. Please check back for updates.

learn more

The Solution

Further information about this project will be available soon. Please check back for updates.

learn more

The Result

Further information about this project will be available soon. Please check back for updates.

Download Case Study

Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

DOWNLOAD

"As Hong Kong aims to reach carbon neutrality by 2050, Paul Y strives to lead Hong Kong in achieving this ambitious goal. Ampd Energy’s Enertainer perfectly aligns with this value and helps us reach the zero-carbon goal by drastically reducing our carbon footprint and at the same time reducing our long-term operational costs. The Enertainer allowed this site on Lee Kung Street to be fully electrified, eliminating the need for diesel gensets. We were impressed with the performance of the Enertainer, and have purchased and deployed multiple units on other sites. We are also very proud that Ampd Energy is a local Hong Kong company that is actively building a sustainable future for the construction industry."

Mr. Kenny W.L. Li
Director & General Manager, Paul Y Engineering Group