New Feature Adoption - Auto Sleep Mode

West Kowloon Station, Hong Kong

Location

Contractor

Project Type

Location

West Kowloon Station, Hong Kong

Project Type

Landmark Integrated Complex

Main Contractor

Yee Fai Construction Co Ltd.

Background

Introduction & Project Information

  • Developer: Sun Hung Kai Properties
  • Delivery Date: 10 February 2022
  • Loads: 4 Tower cranes
  • Enertainer Model: Enertainer L x4
  • Input Current to the Enertainer: ~ 30-40 amps
  • 90%

    lower operating cost1 (vs. 350 kVA generators)

    82%

    CO2 reduction2 (vs. 350 kVA generators)

    32 times

    quieter than diesel generator

    Zero

    on-site air pollutant, improve workers health

    1Assuming a diesel price of HK$11.0 per litre.

    2Assuming a CO2 emission intensity of 0.39 kg per kWh (Source: CLP Sustainability Report 2021)

    The Solution

    Results

    "SHKP adopted many Enertainers on different sites as they could reduce air and noise pollution in our site, which matches our motto, 'Building Homes with Heart.' We appreciate Ampd’s effort on continuous feature enhancement, and we are so happy to be one of the first companies adopting the new feature—Auto Sleep Mode on one of the Enertainers as a trial. We are amazed as it optimized the Enertainer’s energy consumption, with energy savings seen significantly in that Enertainer, especially noting it saved HKD$35,000 a year, and we are considering deploying this new feature to the other units."

    Mr. Gary Liu
    Plant Manager, Sun Hung Kai Properties (Aegis Engineering)

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.