Multi-welfare Services Complex

Kwu Tung, Hong Kong

Location

Contractor

Project Type

Location

Kwu Tung, Hong Kong

Project Type

Modular Integrated Construction (MiC)

Main Contractor

SOCAM Development

Background

Introduction & Project Information

  • Project Manager: HK Architectural Services Department (ASD), HK Development Bureau
  • Delivery Date: 16 Oct 2020
  • Loads: 4 Tower cranes
  • Enertainer Model: Enertainer L
  • Input Current to the Enertainer: ~43 amps
  • HKD854,000/yr

    savings on diesel fuel cost2

    495,865 kg

    annual carbon reduction

    61%

    CO2 reduction 2

    Zero

    on-site air pollution, better for workers’ health

    1Average carbon intensity of electricity is 0.37 kgCO2 per kWh (Source: CLP Sustainability Report 2020)

    24 x Enertainer L replacing 4 x 500 kVA Diesel Generators)

    The Solution

    Results

    "This is the first project where we’re using modular integrated construction technology in full application. Kwu Tung is in a rural area, so power supply is limited, but the Enertainer solved this problem. It also helps reduce the impacts we have on the surrounding community and improve the productivity of our operations. The detailed data provided by the Enernet allowed us to monitor all 4 Enertainers in real time. We’re really happy with the Enertainer. This is the future of construction; we must make it sustainable and data-driven."

    Mr. Adrian Lo
    Head of Corporate Development, SOCAM Development

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.