Kai Tak 1E1, Enertainer for Foundation Projects

Kai Tak, Hong Kong

Location

Contractor

Project Type

Location

Kai Tak, Hong Kong

Project Type

Foundation Residential Development

Main Contractor

Tysan Holdings Limited

Background

Introduction & Project Information

  • Developer: Hong Kong Housing Society
  • Delivery Date: 19 April 2022
  • Loads: 3 Welding machines, 1 Semi-auto welding machine, 1 Water pump, 8 Spotlights, CCTV
  • Enertainer Model: Enertainer F
  • Input Current to the Enertainer: ~ 25-30 amps
  • 82%

    lower operating cost1 (vs. 200 kVA generators)

    75%

    CO2 reduction2 (vs. 200 kVA generators)

    170 amps

    highest current measured

    Zero

    on-site air pollutant, improve workers health

    The Solution

    Results

    "Tysan is always open to adopting innovative technologies to promote both carbon reduction and site operation optimization. Ampd Enertainer is one of these technologies. It is ideal for ELS works, with significantly less carbon emission and less noise than diesel generators. Its online platform 'Enernet' is imperative in optimizing a smart construction site for us. Not only did it allow us to remotely monitor the system at any time, but it also helped us track carbon savings of our site work."

    Mr. Stephen Lam
    Senior Project Manager, Tysan Foundation Limited

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.