Zero Emission Energy for Urbanisation (Foundation)

Central Kowloon Route, Kai Tak West Section (Ma Tau Kok work front)

Location

Contractor

Project Type

Location

Central Kowloon Route, Kai Tak West Section (Ma Tau Kok work front)

Project Type

Foundation (cut-and-cover tunnel by temporary reclamation)

Main Contractor

Gammon Construction (Hong Kong)

Background

Introduction & Project Information

  • Existing Power Supply from Utility: 300 amps
  • Delivery Date: January 2020
  • Loads: Desander (x 1), Water pumps (x 6), 500 amp arc welders (x 2)
  • Enertainer Model: 300 kVA Enertainer
  • 50%
    85%

    The Solution

    Results

    "The Enertainer has been excellent for productivity at our site, as it requires virtually no user operation, recharges itself automatically, and has required no maintenance. Additionally, the data provided by the Enertainer has given us new insights into the operations at our site. We are looking forward to new developments of Ampd's data platform and how these can be used to further enhance site operations in the future."

    Dennis Lee
    Senior Project Manager, Kai Tak West Project, Gammon Construction

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.