Powering Two Tower Cranes, Superstructure
North Point, Hong Kong
Background
Introduction & Project Information
85%
81%
424 amps
90%+
The Challenge
The Solution
Results
"I’ve been looking for a way to reduce our reliance on diesel for a while, so when the chance to use the Ampd Enertainer came along, I was excited. The result delivered beyond the original idea. Not only did it reduce our emissions but also our operational costs and noise. It also proved extremely easy to use, so the project team was very pleased. In addition, we conducted some trials to test the recharging efficiency and the energy storage capacity of the Enertainer. The results exceeded our expectations."
Herman Lee
Senior Manager, Plant and Logistics, Hip Hing
Download Case Study
Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.
Download Case Study
Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.