New Application on Site Operation Facility

Singapore Institute of Technology

Location

Contractor

Project Type

Location

Punggol, Singapore

Project Type

Educational Institution

Main Contractor

Kimly Construction Pte Ltd.

Background

Introduction & Project Information

  • Developer: Singapore Institute of Technology
  • Delivery Date: 30 May 2023
  • Loads: 3-Story Site Office and Workers’ Dormitory (off-peak)
  • Enertainer Model: Enertainer L x1
  • Input Current to the Enertainer: ~ 55 amps (Site Generator)
  • SGD$17,000+
    53% (200+ tonnes)
    Zero
    Zero

    The Solution

    Results

    "We use a fair amount of energy to support our site offices and dormitory for site workers, and we had to deploy 4 large diesel generators to ensure a stable energy stream. By introducing a unit of Enertainer to replace 2 diesel generators, we were able to achieve reliable electricity supply for 24 hours/7 days operation without worrying about any overheating issues. On top of that, we achieved operational cost savings and more than halved our carbon emissions."

    Mr. Roy Khoo
    Director, Kimly Construction

    Download Case Study