A Fully Electrified Construction Site
Valley Road, Ho Man Tin
Background
Introduction & Project Information
99.99%
85% (1)
190 amps
0
The Challenge
The Solution
Results
"We are very excited to see an 85% reduction in carbon emissions and zero downtime during our project. Since the project is so close to residential areas, the Enertainer was integral to keeping air and noise pollution to a minimum. We were also impressed by Ampd’s support in developing an accessory that helped us install the unit in a tight area. We will be deploying more Enertainers at our sites and are looking forward to seeing what Ampd comes up with next."
China Overseas Building Construction Ltd.