A Fully Electrified Construction Site with Zero Diesel Gensets

Lee Kung street, Hung Hom

Location

Contractor

Project Type

Location

Lee Kung Street, Hung Hom

Project Type

Residential Development

Main Contractor

Paul Y. Engineering Group

Background

Introduction & Project Information

  • Developer: Hong Kong Housing Society
  • Delivery Date: 14 Nov 2020
  • Loads: 1 Tower crane, 1 Hoist, 1 Distribution box
  • Enertainer Model: Enertainer L
  • Input Current to the Enertainer: ~35 amps
  • 71%
    72%
    235 amps
    Zero

    The Solution

    Results

    "As Hong Kong aims to reach carbon neutrality by 2050, Paul Y strives to lead Hong Kong in achieving this ambitious goal. Ampd Energy’s Enertainer perfectly aligns with this value and helps us reach the zero-carbon goal by drastically reducing our carbon footprint and at the same time reducing our long-term operational costs. The Enertainer allowed this site on Lee Kung Street to be fully electrified, eliminating the need for diesel gensets. We were impressed with the performance of the Enertainer, and have purchased and deployed multiple units on other sites. We are also very proud that Ampd Energy is a local Hong Kong company that is actively building a sustainable future for the construction industry."

    Mr. Kenny W.L. Li
    Director & General Manager, Paul Y Engineering Group

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.

    Download Case Study

    Discover how our Enertainers can enhance efficiency while protecting the environment and reducing costs.